Actual-Budget drill

When you expand the Actual-Budget drill by click on the + in front of the name, you will see that it consists of several columns: Actual, Budget, Deviation, Actual YTD, Budget YTD, and Deviation YTD. These are the columns that are needed to show a comparison of actual and budgeted values for the current period and year to date.

 

You can add additional columns to the Actual-Budget drill by right clicking it and selecting Add -> Node type column. Double click on a column to configure it.

It is also possible to add Modifier columns to Actual-Budget drills. See the Custom drill section for information about Modifier columns.

Properties

General

Configuration

After the query table is connected to the drill, it must be specifically configured for use in drills, i.e.

Audit

Advanced

ID

The ID of the default Actual-Budget drill is generated by the system and cannot be changed.

 

Access control

Column Properties

Each column in the Actual-Budget drill has the following properties:

 

General

Configuration

Example:

As an example let's see how the 'Deviation YTD' column is configured. Double click on the Deviation YTD column. "Actual" has been selected in 'Node type', 'Operator' contains "-" , and 'Second Node type' contains "Budget". So the resulting calculation will be "Actual" - "Budget". In addition YTD is checked, indicating that the column will contain Year to Date values for the calculation.

Advanced

ID

 

Access control

 

Version 5.1.2.0

This document contains confidential information. Not to be copied by third parties without written authorization.

© Copyright Corporater AS - All rights reserved.